Quote:
Originally Posted by Patrick303
We started by selecting spacing so that the pavers lined up with the edge of the pool and then moved outward.
|
Thanks! I was wondering if there were any rough guidelines for the size of the concrete patch vs gap to accommodate for drainage while still ensuring that the concrete patches were stable (e.g., not tilt, crack, etc.).